Road Maintenance Progress Report March – April 2024
Road Maintenance Progress Report March – April 2024
ITEM | ACTIVITY DISCRIPTION | ACTUAL WORK DONE | TOTAL QUANTITY |
1 | Gravel Patching | Bvamaropa street – 68Mazorodze street – 5Mboroma street – 4G.Heasman street – 79C.Majange street – 2Chesvingo street – 5Factory road – 112Mineral road – 252Westview drive – 32Moyondizvo street – 220Pangolin shopping centre – 40 | 819 m2 |
2 | Paintings (Carriage Way And Parking Bays | E.Mnangagwa street – 166R.G Mugabe street – 19Bvudzijena – 410 carriage way marking | 185 parking bays painted 410m carriage way marked |
3 | Hauling | (Silts)Oliver street, Dindingwe drive – 2 E. Zvobgo street – 7 Fire wood – 1 | 10 loads |
4 | Drain Desilting | Oliver street – 68Green field – 11C.Majange street – 31Mazorodze street – 112Chimoio street – 120 | 342m |
5 | Culvert Cleaning | C.Majange street – 2 | 2 culverts |
6 | Drain Excavation | Dindingwe Drive – 260Dindingwe crescent – 33Kaguvi street – 44 | 337m |
7 | Traffic Signs Installation | Shakashe drive – 1 stop signLavander street – 2 stop signsE.Mnangagwa street – 1 stop signMorning side – 3 stop signMusika street – 1 stop signIngwe drive – 1 stop signMashavishavi street – 1 stop signZimuto street – 1 stop signMucheke rank – 1 stop signChasura street – 1 chevron Mboroma – 1 stop signMazorodze street – 1 stop signMushandike street – 3 stop signMharapara street – 1 stop signDare street – 1 stop signMuzenda street – 1 stop signJongwe street – 1 stop signDindingwe drive – 1 stop sign | 23 signs installed |
8 | Catch Pits Cleaning | E.D Mnangagwa street – 4L.Takawira street – 3R.G Mugabe street – 1J.Moyo ave – 3Green field street – 5 Down Town – 3 | 19 catch pits cleaned |
9 | Grading | S.Tavarwisa street – 50Kopje shopping – 40Majange shopping centre – 18Zviitirei street – 300Mushuku street – 370Ndira street – 430Zimuto camp – 700Nyaradzo street – 370Gusheshe street – 200Manhede street – 400Shezhu street – 290S Makuyana – 480 | 3.608 km graded |
10 | Tar Patch | Chesvingo street -22 | 22m2 |
11 | Burst Pipe | Morning side – 1 | 1 |